Friday, August 26, 2011

Late this week and into next week, Berger Excavating is scheduled to begin transferring the individual water services for each home from the old main to the new main on Culver Lane. The morning of the work, the contractor will knock on your door to notify you of the pending water shutoff and give you ample time to use your water. The shutoff will last for 1 to 2 hours on average. Once installed, they will ask you to flush your system, and if no one is home, they will use an outside hose bib connection to flush the new service. If you have discolored water, please open your faucets and flush out the lines and the water should clear up.

Possibly late next week (weather permitting) Berger will also begin road excavation and replacement on Lehigh and Central. Parking will not be allowed on the streets between 7:00am and 5:00pm.

Friday, August 19, 2011

Next week, Berger Excavating is on schedule to finish transferring the individual water services for each home from the old main to the new main on George Court. Late next week, Berger Excavating is scheduled to begin transferring the individual water services for each home from the old main to the new main on Culver Lane. The morning of the work, the contractor will knock on your door to notify you of the pending water shutoff and give you ample time to use your water. The shutoff will last for 1 to 2 hours on average. Once installed, they will ask you to flush your system, and if no one is home, they will use an outside hose bib connection to flush the new service. If you have discolored water, please open your faucets and flush out the lines and the water should clear up.

Berger will also begin road excavation and replacement on Lehigh and Central. Parking will not be allowed on the streets between 7:00am and 5:00pm.

Friday, August 12, 2011


Berger Excavating is working to finish the storm sewer work on Lehigh Avenue (see photo above) this week and early next week. Berger will also begin road excavation and replacement on Lehigh and Central. Parking will not be allowed on the streets between 7:00am and 5:00pm.

Next week, Berger Excavating is scheduled to begin transferring the individual water services for each home from the old main to the new main on George Court. The morning of the work, the contractor will knock on your door to notify you of the pending water shutoff and give you ample time to use your water. The shutoff will last for 2 to 4 hours on average. Once installed, they will ask you to flush your system, and if no one is home, they will use an outside hose bib connection to flush the new service. If you have discolored water, please open your faucets and flush out the lines and the water should clear up.

Also next week, Berger Excavating is looking to complete various water main connections and fire hydrants on Culver Lane now that the water main has been installed by horizontal directional drilling.

Friday, August 5, 2011

Berger Excavating is scheduled to complete various water main connections next week which will require temporary water main shutdowns. The Village of Glenview Public Works Department will be notifying residents the day before these temporary shutdowns are scheduled to occur.
Berger Excavating is also scheduled to continue with the water main installation by horizontal directional drilling method on Culver Lane from Lehigh to Harlem Avenue. Horizontal direction drilling is a trenchless method of installing water main used in order to minimize disturbance to the roadways, parkways, and driveways.